{"id":4182,"date":"2026-11-23T08:31:27","date_gmt":"2026-11-23T08:31:27","guid":{"rendered":"https:\/\/pjm.co.at\/en\/?p=4182"},"modified":"2026-11-23T08:31:27","modified_gmt":"2026-11-23T08:31:27","slug":"great-interest-during-the-tour-of-the-independent-test-and-innovation-center-in-mellach","status":"publish","type":"post","link":"https:\/\/pjm.co.at\/en\/blog\/2026\/11\/23\/great-interest-during-the-tour-of-the-independent-test-and-innovation-center-in-mellach\/","title":{"rendered":"Great interest during the tour of the independent Test and Innovation Center in Mellach"},"content":{"rendered":"<p><p class=\"ffb-id-pk3copb fg-paragraph text-center    fg-text-dark\"><\/p><style><\/style><script type=\"text\/javascript\"><\/script><section class=\"ffb-id-2ski5oak fg-section fg-text-dark\"><div class=\"fg-container container fg-container-large fg-container-lvl--1 \"><div class=\"fg-row row    \" ><div class=\"ffb-id-2ski5oam fg-col col-xs-12 col-md-6 fg-text-dark\"><div class=\"ffb-id-2ski7208 fg-paragraph ff-richtext text-left    fg-text-dark\"><\/p>\n<p><strong>Immediately after the Rolling Stock Conference, around 60 industry experts seized the opportunity to take an exclusive behind-the-scenes look. During the guided tour of the INFRATRACK Test and Innovation Centre in Mellach, the centre showcased itself as a high-performance hub for vehicle testing, commissioning and certification procedures.<\/strong><\/p>\n<p>The event began with a brief technical presentation on the site&rsquo;s range of services. Designed as a one-stop centre, the facility is notable above all for its ideal infrastructure and strategic location. With its own 4.5-kilometre-long electrified track system for test runs, ample parking areas and state-of-the-art commissioning facilities, Mellach offers optimal conditions on site. Thanks to its direct connection to the main rail network, the adjacent key corridors - including the Koralm Railway, the S&uuml;dbahn and the Semmering - are also available for further route testing.<\/p>\n<p>After the theoretical part of the programme, participants took a guided tour of the facility and the extensive test site to experience the technical capabilities first-hand, and received information directly from Martin Joch and Andreas Schaller, the managing directors of INFRATRACK Solutions GmbH.<\/p>\n<p>Bernhard Mittelbach of ACstyria moderated the event. The Styrian mobility cluster supported the concept and preparations for the construction of the test centre in southern Graz. Stefan Marschnig, chairman of the Rail Vehicle Conference, and Robert Koubek, managing director of Verbund Thermal Power, were pleased with the high level of interest in the &ldquo;live tour&rdquo;.<\/p>\n<p><strong>Maximum flexibility for your projects<\/strong><\/p>\n<p>A key benefit of the testing and innovation center in Mellach is its high degree of flexibility in project management. Customers can use the infrastructure on their own or opt for the full-service offering from the PJM Group: turnkey, comprehensive support from a single source - from the initial technical review through engineering and the execution of test drives to final approval. In addition, all permits for test and trial runs, as well as network registration, can be easily processed through the RCC.<\/p>\n<p><strong>New: Easily book capacity online at infratrack.at<\/strong><\/p>\n<p>To make the planning of testing and parking capacity even more efficient, the new digital booking portal at <a href=\"http:\/\/www.infratrack.at\" target=\"_blank\" rel=\"noopener\">www.infratrack.at\/en<\/a> - developed by BOOM Software - is now available.<\/p>\n<p>After a simple sign-up using your email address, you can view the current availability of the test track and sidings at any time and make a reservation directly. The platform handles the entire process end-to-end - from submitting a quote to making a binding reservation and finalizing payment.<\/p>\n<p>For companies with regular needs, there is also the option to establish the contractual terms in advance through a framework agreement and then flexibly book individual time slots via the portal as needed.<\/p>\n<p>Check available capacity now:<br \/><a href=\"http:\/\/www.infratrack.at\" target=\"_blank\" rel=\"noopener\">www.infratrack.at\/en<\/a><\/p>\n<p><\/div><\/div><div class=\"ffb-id-86c3slst fg-col col-xs-12 col-md-6 fg-text-dark\"><a class=\"ffb-id-8smuotg6 responsive-image-wrapper fg-text-dark\" href=\"https:\/\/www.youtube.com\/watch?v=HWL3MkI9YZ4\" target=\"_blank\"><img decoding=\"async\"  class=\"fg-image  img-responsive full-width\"  src=\"https:\/\/pjm.co.at\/en\/wp-content\/uploads\/sites\/2\/2026\/11\/Mellach-1.gif\"  alt=\"Mellach\"  title=\"\"   =\"\" ><\/a><\/div><\/div><\/div><\/section><style>.ffb-id-86c3slst{ padding-bottom: 20px;}@media (min-width:768px) { .ffb-id-86c3slst{ padding-bottom: 20px;}}@media (min-width:992px) { .ffb-id-86c3slst{ padding-bottom: 20px;}}@media (min-width:1200px) { .ffb-id-86c3slst{ padding-bottom: 20px;}}.ffb-id-8smuotg6{ padding-bottom: 20px;}@media (min-width:768px) { .ffb-id-8smuotg6{ padding-bottom: 20px;}}@media (min-width:992px) { .ffb-id-8smuotg6{ padding-bottom: 20px;}}@media (min-width:1200px) { .ffb-id-8smuotg6{ padding-bottom: 20px;}}<\/style><script type=\"text\/javascript\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":6,"featured_media":4184,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,4],"tags":[584,588,210,310,591,398,586,106,555,589,51,241,110,592,621,587,585,604,322,479,443,39,619,539,620,554,590,67],"class_list":["post-4182","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general","category-news","tag-accredited-test-enter","tag-acoustic-measurements","tag-acoustics","tag-aerodynamics","tag-brake-tests","tag-calculation","tag-connecting-railway","tag-construction","tag-dynamic-track-tests","tag-emc-measurements","tag-engineering","tag-erci-innovation-award","tag-fatigue-strength","tag-infratrack","tag-innovation-center","tag-instrumentation","tag-mellach","tag-nafems","tag-optimisation","tag-pantograph","tag-pj-messtechnik","tag-pjm","tag-rolling-stock-conference-graz","tag-static-tests","tag-test-center","tag-test-center-according-to-iso-iec-17025","tag-testing","tag-vehicle-dynamics","post-wrapper"],"_links":{"self":[{"href":"https:\/\/pjm.co.at\/en\/wp-json\/wp\/v2\/posts\/4182","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pjm.co.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pjm.co.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pjm.co.at\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/pjm.co.at\/en\/wp-json\/wp\/v2\/comments?post=4182"}],"version-history":[{"count":3,"href":"https:\/\/pjm.co.at\/en\/wp-json\/wp\/v2\/posts\/4182\/revisions"}],"predecessor-version":[{"id":4192,"href":"https:\/\/pjm.co.at\/en\/wp-json\/wp\/v2\/posts\/4182\/revisions\/4192"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pjm.co.at\/en\/wp-json\/wp\/v2\/media\/4184"}],"wp:attachment":[{"href":"https:\/\/pjm.co.at\/en\/wp-json\/wp\/v2\/media?parent=4182"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pjm.co.at\/en\/wp-json\/wp\/v2\/categories?post=4182"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pjm.co.at\/en\/wp-json\/wp\/v2\/tags?post=4182"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}