Graz in Berlin: Tests of approval of the new suburban train set
Special project features
- 400 measurement channels which are clearly above the average amount of channels in other projects.
- The torsional vibrations were measured at 4 axles in order to detect which wheelset is stressed at a maximum level. The bending and torsion stresses were measured on 6 axles (in summary 30 telemetry channels).
- PJM had designed special accelerometers to protect them from high voltage of the current collector.
- PJM had applied new telemetry systems and had designed special mounting systems on the running axles.
Great overall skills of the PJM-team
„Currently, major projects in Berlin - such as the new airport - are public issues. Thus, a very experienced team with both technical expertise and professional appearance is the basis of a successful project”, says CEO Martin Joch.
The new train sets will be in operation in January 2021.
Get the full sucess story: