VTG relies on automation of brake testing with PJM

VTG, Europe's leading private operator of freight wagons, will offer PJM's automatic brake testing system as a project-related equipment option. VTG is thus consistently pursuing its digitalisation strategy in order to achieve further increases in efficiency in the handling of freight trains.

Automatic brake testing is a crucial factor in the preparation of freight trains, as it is obligatory to check the brakes each time a change is made to the wagon configuration or the wagon is stationary for more than 24 hours. Hence, the potential savings for railway companies in this time-consuming process are high, both in terms of human labour and costs.

Since 2017, the technology developed by PJM and SBB Cargo has been successfully tested in pilot freight trains. Based on this extensive testing, VTG will make this system available as an equipment option. The expansion of the equipment portfolio with the automatic brake test system supports the integration of the Digital Automatic Coupling (DAC) and represents another important step in the digitalisation strategy of both companies.

Media release

 

 

PJM-ABP-VTG4klein

DB Cargo pilot train with automated brake testing has started parallel operation at MEG

Automated brake testing is also picking up speed in Germany. A pilot train with the automated brake testing system has been put into parallel operation by DB Cargo at Mitteldeutsche Eisenbahn GmbH (MEG). The technology has been developed by PJM and has been regarded as the European reference system since the positive evaluation by TÜV. The automated brake test meets all technical and formal criteria as well as safety-relevant specifications. The next step of the approved system is the roll-out. The brake test system is also designed for further automation steps. Thanks to the energy-autonomous and efficient power supply and local radio system, the system is now available and can be used flexibly for retrofit and new vehicles. The modular design ensures compatibility with future DAC. Depending on the operating grade, the brake test will be carried out automatically 4 - 6 times a day or around 1,800 times a year.

The automated brake test is an important component in making rail freight transport more efficient, faster and more attractive. The automated system creates efficiency: the time saved for a 400-meter freight train is around 2 x 35 minutes and the process can be carried out by the locomotive driver or wagon master alone. This is a major advantage from the perspective of the future labour market. The shortage of skilled workers and shunting personnel will increase in the coming years due to demographic developments. "It's high time to replace outdated work and tedious manual tasks with automated processes. Automation brings the urgently needed efficiency boost as well as increasing the profitability of rail transport. And it creates attractive job profiles," says Günter Petschnig, CEO of PJM.

 

RailTech Innovation Award 2022: PJM is audience award winner

Our innovative automated brake testing systen was the first choice for the professional audience at RailTech 2022. We are delighted to receive another award for our technology for digital rail freight. The 5th award was presented on 21 June 2022 in Utrecht.

All awards at a glance:

  • RailTech Innovation Award 2022 (Audience Choice)
  • ERCI Innovation Award 2021 (PJ Monitoring was awarded "Best SME" among 17 states of the European Railway Cluster Initiative)
  • German Innovation Award Winner 2020
  • Austrian Mobility Award 2020 by VCÖ (Category digitalisation)
  • Fast Forward Award 2019
RailTechAward_3

Be up to date with our periodical newsletter

PJ Messtechnik GmbH
PJ Monitoring GmbH

Waagner-Biro-Straße 125
8020 Graz
Austria

Tel.: +43 316 228454
Fax: +43 316 228454-15
[email protected]

© 2024 PJ Messtechnik, PJ Monitoring. All rights reserved

WordPress Cookie Plugin by Real Cookie Banner