DB Cargo pilot train with automated brake testing has started parallel operation at MEG

Automated brake testing is also picking up speed in Germany. A pilot train with the automated brake testing system has been put into parallel operation by DB Cargo at Mitteldeutsche Eisenbahn GmbH (MEG). The technology has been developed by PJM and has been regarded as the European reference system since the positive evaluation by TÜV. The automated brake test meets all technical and formal criteria as well as safety-relevant specifications. The next step of the approved system is the roll-out. The brake test system is also designed for further automation steps. Thanks to the energy-autonomous and efficient power supply and local radio system, the system is now available and can be used flexibly for retrofit and new vehicles. The modular design ensures compatibility with future DAC. Depending on the operating grade, the brake test will be carried out automatically 4 - 6 times a day or around 1,800 times a year.

The automated brake test is an important component in making rail freight transport more efficient, faster and more attractive. The automated system creates efficiency: the time saved for a 400-meter freight train is around 2 x 35 minutes and the process can be carried out by the locomotive driver or wagon master alone. This is a major advantage from the perspective of the future labour market. The shortage of skilled workers and shunting personnel will increase in the coming years due to demographic developments. "It's high time to replace outdated work and tedious manual tasks with automated processes. Automation brings the urgently needed efficiency boost as well as increasing the profitability of rail transport. And it creates attractive job profiles," says Günter Petschnig, CEO of PJM.

 

Live in Berlin: We present novelties at the Railway Forum

The railway industry meets again "live" at the Berlin Railway Forum. Mobility know-how "Made in Styria" also will be presented at the first-class industry event. We are looking forward to your visit at the joint booth of AC Styria!

The major headlines of the industry meeting are, among others, the development of the railroad system, digitalization & automation as well as sustainability. We are the innovation leader in all of these topics: our digital overall system WaggonTracker, which makes SGV more attractive, better and faster, our technical solution of automated brake testing and our system for automated load monitoring. In measurement technology, too, we are constantly coming up with new solutions and technologies, such as our autonomous measurement system.

banner-744x400-3

Be up to date with our periodical newsletter

PJ Messtechnik GmbH
PJ Monitoring GmbH

Waagner-Biro-Straße 125
8020 Graz
Austria

Tel.: +43 316 228454
Fax: +43 316 228454-15
[email protected]

© 2025 PJ Messtechnik, PJ Monitoring. All rights reserved

WordPress Cookie Plugin by Real Cookie Banner